{
  "_about": {
    "purpose": "Machine-readable catalog of one TVA page, written for AI assistants, answer engines and agents that need to answer questions about Section 26a shoreline permits accurately and cite a source.",
    "served_at": "https://www.tva.com/environment/shoreline-construction-permits/ai-catalog.json",
    "discovery": [
      "Linked from https://www.tva.com/llms.txt",
      "Linked from the page itself: <link rel=\"alternate\" type=\"application/json\" title=\"AI catalog\" href=\"/environment/shoreline-construction-permits/ai-catalog.json\">"
    ],
    "spec_note": "There is no ratified 'ai-catalog.json' standard. This file follows schema.org vocabulary where a term exists, and uses plainly named custom fields where it does not. Field names are stable; consumers should ignore unknown fields rather than fail.",
    "catalog_version": "1.0.0",
    "content_version": "2026-11-10",
    "generated": "2026-11-10",
    "review_cadence_days": 90,
    "stale_after": "2027-02-08",
    "maintainer": {
      "name": "Tennessee Valley Authority — Public Land Information Center",
      "email": "plic@tva.gov",
      "telephone": "+1-800-882-5263"
    }
  },

  "page": {
    "@type": "WebPage",
    "url": "https://www.tva.com/environment/shoreline-construction-permits",
    "canonical": "https://www.tva.com/environment/shoreline-construction-permits",
    "name": "Shoreline and Dock Permits",
    "eyebrow": "Section 26a Permits",
    "alternate_names": [
      "Section 26a permits",
      "Shoreline construction permits",
      "TVA dock permit",
      "Shoreline & Dock Permits"
    ],
    "summary": "How to get TVA permission to build, modify, maintain or take ownership of a dock, boathouse, shoreline stabilization, water intake or other obstruction in, along or across the Tennessee River system. Covers who needs a Section 26a permit, minor vs. major projects, the application process, the fee, the governing regulations, and who to call.",
    "audience": [
      "Waterfront property owners on TVA reservoirs",
      "Prospective buyers and sellers of waterfront property",
      "Realtors",
      "Dock and marina builders",
      "Floating cabin owners",
      "Utilities, DOTs, local governments and commercial developers"
    ],
    "in_language": "en-US",
    "is_part_of": "https://www.tva.com/environment",
    "breadcrumb": ["Home", "Environment", "Shoreline & Dock Permits"],
    "publisher": {
      "@type": "GovernmentOrganization",
      "name": "Tennessee Valley Authority",
      "url": "https://www.tva.com",
      "jurisdiction": "Tennessee River watershed across Tennessee and parts of Alabama, Georgia, Kentucky, Mississippi, North Carolina and Virginia"
    },
    "license": "U.S. Government work. See https://www.tva.com/information/legal-notices",
    "page_structure_note": "The page is a single URL with seven tab panels. Only five panels have URL fragments; 'Project types' and 'Buying / selling' render without their own fragment, so they cannot be deep-linked today."
  },

  "sections": [
    { "id": "overview",     "name": "Overview",        "url": "https://www.tva.com/environment/shoreline-construction-permits#overview",     "covers": ["what Section 26a is", "whether a permit is needed", "TVA jurisdiction", "what does not need a permit", "on-reservoir vs. off-reservoir", "zone eligibility map"] },
    { "id": "projects",     "name": "Project types",   "url": null, "deep_link_available": false, "covers": ["minor projects", "major projects", "drawing requirements", "water intakes", "floating cabins", "special river standards"] },
    { "id": "how-to-apply", "name": "How to apply",    "url": "https://www.tva.com/environment/shoreline-construction-permits#how-to-apply", "covers": ["eight application steps", "fee schedule", "downloadable drawings", "tips", "state Section 401 certification"] },
    { "id": "regulations",  "name": "Regulations",     "url": "https://www.tva.com/environment/shoreline-construction-permits#regulations",  "covers": ["18 C.F.R. Part 1304 by topic", "Subpart A procedures", "Subpart B floating cabins", "Subpart C residential access shoreland"] },
    { "id": "faq",          "name": "FAQ",             "url": "https://www.tva.com/environment/shoreline-construction-permits#faq",          "covers": ["docks and residential water-use facilities", "applications", "ownership transfer", "authorized agents"] },
    { "id": "property",     "name": "Buying / selling","url": null, "deep_link_available": false, "covers": ["pre-purchase due diligence", "seller compliance checks", "common non-compliance", "realtor workshops"] },
    { "id": "contact",      "name": "Get help",        "url": "https://www.tva.com/environment/shoreline-construction-permits#contact",      "covers": ["PLIC", "regional offices and appointments", "floating cabin team", "state water quality offices"] }
  ],

  "key_facts": [
    { "id": "legal-basis",            "fact": "A Section 26a permit is required before constructing, operating or maintaining any dam, appurtenant works or other obstruction across, along or in the Tennessee River or any of its tributaries.", "authority": "Section 26a of the TVA Act; 18 C.F.R. Part 1304", "section": "overview" },
    { "id": "fee",                    "fact": "The application fee is $1,000 for all project types.", "qualifiers": ["Non-refundable, including if the application is denied", "Paying the fee does not guarantee approval", "Some activities qualify for a waiver at TVA's discretion", "Major projects may require additional fees", "One application may cover multiple activities at the same location for a single fee; later activities or modifications require a separate fee"], "section": "how-to-apply" },
    { "id": "processing-time",        "fact": "Processing can take up to 120 days. Incomplete applications may be returned or cause delays.", "section": "how-to-apply" },
    { "id": "online-only",           "fact": "As of October 1, 2025, paper applications are no longer accepted. Applications are submitted through TVA's Online Section 26a Application System.", "effective_date": "2025-10-01", "section": "faq" },
    { "id": "eligible-zones",         "fact": "Residential shoreline construction is generally eligible only where property borders Zone 1 (blue) or Zone 7 (yellow). Eligibility to apply does not guarantee approval.", "section": "overview" },
    { "id": "jurisdiction-reservoir", "fact": "On TVA reservoirs, jurisdiction typically extends to the 500-year floodplain (0.2% annual chance of flooding), or the upper limit of TVA flowage rights, whichever is higher.", "section": "overview" },
    { "id": "jurisdiction-other",     "fact": "On regulated rivers and streams where TVA has not obtained land rights, and on unregulated tributaries, jurisdiction typically extends to the 100-year floodplain.", "section": "overview" },
    { "id": "permit-expiration",      "fact": "A permit expires if construction is not initiated within 18 months of the date the permit was issued.", "authority": "18 C.F.R. § 1304.9", "section": "regulations" },
    { "id": "ownership-transfer",     "fact": "Permits do not transfer automatically with property. A new owner must apply for a Section 26a permit within 60 days of closing, and the facility must match the previous permit to qualify for a transfer.", "authority": "18 C.F.R. § 1304.10", "section": "regulations" },
    { "id": "facility-size-new",      "fact": "In new developments, residential water-use facilities must be 1,000 square feet or less, and use of TVA property is limited to an access corridor.", "section": "faq" },
    { "id": "facility-size-pre1999",  "fact": "In preexisting developments — a subdivision recorded before November 1, 1999 in which TVA permitted at least one water-use facility before November 1, 1999 — residential water-use facilities must be 1,800 square feet or less. Where site constraints prevent the maximum size, TVA determines the size that may be approved.", "section": "faq" },
    { "id": "grandfathered",          "fact": "Facilities TVA permitted before November 1, 1999 (when the Shoreline Management Policy took effect) and built as approved are 'grandfathered', but a permit is still required and the new owner must apply when the property changes hands.", "section": "faq" },
    { "id": "second-story",           "fact": "A second story on a dock may be an open deck with railing, but it cannot be covered or enclosed.", "section": "property" },
    { "id": "tva-land-permission",    "fact": "Permission from TVA is always required before conducting any activity on TVA land, including vegetation removal, even for activities that are not themselves obstructions.", "section": "overview" },
    { "id": "state-401",              "fact": "If a project may result in a discharge into navigable waters, a state Section 401 water quality certification must be included with the application. TVA may be unable to issue the 26a permit until the certification or a waiver is obtained.", "section": "projects" },
    { "id": "fc-application-deadline","fact": "Initial Section 26a applications for existing floating cabins must be submitted before October 1, 2029. TVA may deny an initial application after that date.", "authority": "18 C.F.R. § 1304.101(c)", "deadline": "2029-10-01", "section": "regulations" },
    { "id": "fc-flotation-deadline",  "fact": "Floating cabins must meet approved flotation standards by December 31, 2031.", "authority": "18 C.F.R. § 1304.103(b)", "deadline": "2031-12-31", "section": "regulations" },
    { "id": "fc-registration",        "fact": "All existing floating cabins must be registered with TVA.", "authority": "18 C.F.R. § 1304.101(b)", "section": "regulations" },
    { "id": "fc-no-expansion",        "fact": "All expansions of a floating cabin in length, width or height are prohibited. Other modifications are limited and require written pre-approval. Floating cabins may not be relocated without TVA approval, and moving to another TVA reservoir is prohibited.", "authority": "18 C.F.R. § 1304.101(g), (h)(2)", "section": "regulations" },
    { "id": "no-approval-guarantee",  "fact": "Site-specific conditions affect review. Applying, and paying the fee, does not guarantee approval. Applicants should not buy materials or begin building until the permit is in hand.", "section": "projects" }
  ],

  "project_classification": {
    "minor": {
      "definition": "The most common type of shoreline permit.",
      "examples": [
        "Residential docks",
        "Piers",
        "Boathouses",
        "Pathways, sidewalks, steps and boardwalks less than 8 feet wide",
        "Floating cabins",
        "Shoreline stabilization of 500 feet or less",
        "Water intakes under 50,000 gallons per day",
        "Buoy lines and floating signs within approved harbor limits"
      ],
      "drawing_requirements": {
        "paper": "8.5 by 11 inches, suitable for reproduction",
        "must_show": [
          "Kind of structure and its purpose or intended use",
          "Principal dimensions, size and location relative to the shoreline and adjacent property boundaries",
          "Height of the structure above the water",
          "Both a plan view (from above) and an elevation view (from the side)",
          "Reservoir or river name, river mile, locator landmarks and direction of water flow"
        ]
      }
    },
    "major": {
      "examples": [
        "Boat launching ramps",
        "Boat channel or harbor dredging",
        "Community docks",
        "Commercial marinas",
        "Barge terminals and barge mooring structures",
        "Utility crossings",
        "Bridges, culverts and roads",
        "Shoreline stabilization of more than 500 feet",
        "Water intakes of 50,000 gallons per day or more",
        "Wastewater or sewage outfalls",
        "Placement of fill"
      ],
      "drawing_requirements": {
        "paper": "No larger than 11 by 17 inches, suitable for reproduction",
        "must_show": [
          "Date, applicant name, stream/river/reservoir name, river mile, landmarks and direction of water flow",
          "Kind of structure and its purpose or intended use",
          "Plan and profile views with principal dimensions, size and location relative to the shoreline",
          "Elevations relative to normal summer pool (on-reservoir) or normal high-water elevation above mean sea level (off-reservoir)",
          "North arrow"
        ],
        "if_applicable": [
          "Material laydown, staging and equipment storage areas, new access roads and road closures",
          "Location of borrow or spoil areas on or off TVA land",
          "Extent of soil and vegetative disturbance",
          "Any special reservoir operations needed, such as drawdown or discharge restrictions"
        ]
      },
      "additional_requirement": "Major applications must include a signed Section 26a Cost Recovery Acknowledgment form."
    },
    "location_terms": {
      "on_reservoir": "The project is across, along or in a TVA reservoir where water levels are controlled by a dam. Generally includes areas where TVA has obtained land or land rights.",
      "off_reservoir": "The project is on rivers or streams upstream of a TVA dam's influence, or downstream of a TVA dam where TVA has not obtained land rights."
    },
    "obstruction_definition": "Any man-made physical condition that impounds, checks, hinders, restricts, retards, diverts or otherwise interferes with the movement of water or objects on or in the water."
  },

  "not_requiring_a_tva_permit": {
    "caveat": "These activities on privately owned land are not considered obstructions and do not need a TVA permit, but may still require local, state or other federal permits. Permission from TVA is still always required for any activity on TVA land.",
    "activities": [
      "Removing trees, stumps, brush or gravel from a streambed, unless piled to create an obstruction",
      "Excavating a new channel or enlarging an existing one, unless it blocks, restricts or drains the old channel or the spoil creates an obstruction",
      "Burying utility lines under a stream by trench, backfilled to original contour and outside navigation channels",
      "Directional boring under streams for utilities with no permanent obstruction in the floodplain",
      "Construction on temporary, intermittent, seasonal or wet-weather streams or drainages",
      "Discharges into the river system, unless made through an outfall pipe or other obstruction",
      "Replacing culverts of the same or greater hydraulic capacity in the same highway alignment",
      "Replacing bridges of the same or greater hydraulic capacity in the same alignment"
    ],
    "also_see": "Construction on certain tributary streams upstream of TVA reservoir influence may be exempt under TVA's Interpretive Rule."
  },

  "process": {
    "name": "Section 26a application process",
    "estimated_duration": "Up to 120 days",
    "steps": [
      { "step": 1, "name": "Check if you can apply", "detail": "Use the interactive zone map to see whether the property is in Zone 1 (blue) or Zone 7 (yellow), and review the regulations for the project type. Special standards may apply on the Clinch, French Broad, Holston and Hiwassee rivers." },
      { "step": 2, "name": "Determine on-reservoir or off-reservoir", "detail": "Call (800) 882-5263 if unsure." },
      { "step": 3, "name": "Review the application checklist", "detail": "Incomplete applications will be returned." },
      { "step": 4, "name": "Determine the correct fee", "detail": "The online system calculates the fee automatically." },
      { "step": 5, "name": "Make drawings of the project", "detail": "One drawing per facility or activity, including vegetation management on TVA property, plus a site plan showing all facilities in relation to the shoreline and neighboring facilities. Attach as PDF or DOC." },
      { "step": 6, "name": "Indicate the project location", "detail": "Physical address, or subdivision name and lot number." },
      { "step": 7, "name": "Take photos", "detail": "Photograph the property, the proposed work area and any existing structures. Attach as PDF, JPG or TIF. Applications without photos may be returned." },
      { "step": 8, "name": "Submit the application online", "detail": "Submit through TVA's Online Section 26a Application System. Progress can be saved. TVA reviews for completeness, then directs payment if applicable." }
    ],
    "tips": [
      "Submit a complete application — the top tip from TVA watershed representatives",
      "Be flexible with project plans; small changes can decide approval or denial",
      "Do not buy materials or start building until the permit is in hand",
      "Contact the state water quality office early",
      "Include final plans covering utilities, stabilization, vegetation management and access across TVA property",
      "Include photos of the property and any existing structures"
    ]
  },

  "fee_schedule": {
    "currency": "USD",
    "refundable": false,
    "rows": [
      { "project_type": "On-reservoir minor construction — docks, boathouses, floating cabins, change of ownership, other minor shoreline alterations", "fee": 1000 },
      { "project_type": "On-reservoir major construction — boat launching ramps, marinas, community facilities, bridges, barge terminals, other major alterations", "fee": 1000, "note": "May require additional fees" },
      { "project_type": "Off-reservoir minor or major construction on regulated rivers and streams downstream of TVA dams", "fee": 1000, "note": "Major projects may require additional fees" },
      { "project_type": "Off-reservoir water intakes of 50,000+ gallons per day, or grading and fills involving construction of a dam or impoundment upstream of TVA reservoir influence", "fee": 1000, "note": "May require additional fees" },
      { "project_type": "Shoreline stabilization only, fish attractors, DOT projects, county or municipal road projects, NRCS projects, marina sewage pump-outs, public purpose projects (excluding municipal or public water intakes)", "fee": 0, "note": "No fee; waiver at TVA's discretion" }
    ]
  },

  "actions": [
    { "id": "apply", "name": "Apply for a Section 26a permit", "url": "https://reva.tva.gov/", "channel": "online", "note": "TVA's Online Section 26a Application System. Paper applications are not accepted as of October 1, 2025.", "preconditions": ["Property zone checked", "On-reservoir vs. off-reservoir determined", "Application checklist reviewed", "Project drawings prepared", "Site photos taken", "$1,000 non-refundable fee understood"] },
    { "id": "check-zone", "name": "Check property zone on the interactive map", "url": "https://www.arcgis.com/apps/Embed/index.html?webmap=30d1cc53e22242a88cde834e244fc650", "channel": "web map", "note": "Zone 1 (blue) and Zone 7 (yellow) are generally eligible for residential shoreline construction." },
    { "id": "contact-plic", "name": "Contact the Public Land Information Center", "url": "https://www.tva.com/environment/environmental-stewardship/public-land-information-center", "telephone": "+1-800-882-5263", "email": "plic@tva.gov" },
    { "id": "schedule-appointment", "name": "Schedule a meeting with a TVA regional representative", "url": "https://www.tva.com/environment/environmental-stewardship/water-quality/tva-regional-contacts", "note": "TVA regional offices do not accept walk-ins." },
    { "id": "floating-cabin-help", "name": "Contact the floating cabin team", "telephone": "+1-865-632-1327", "email": "fc@tva.gov" }
  ],

  "documents": [
    { "name": "Section 26a application checklist", "format": "PDF", "dated": "2023-04", "url": "https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/environment/shoreline-construction/26a-application-checklist-april-2023.pdf?sfvrsn=2aa79c9d_1" },
    { "name": "Section 26a Cost Recovery Acknowledgment form", "format": "PDF", "required_for": "Major projects", "url": "https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/environment/shoreline-construction/section-26a-cost-recovery-acknowledgment-form-2138436227fcd-cf50-487c-8aa6-bff6dc24057e.pdf?sfvrsn=c473e9a0_3" },
    { "name": "Floating cabin registration form", "format": "PDF", "dated": "2025-07", "url": "https://www.tva.com/docs/default-source/forms/floating-cabin-registration-form-july-2025-updated.pdf?sfvrsn=6e3dfaad_1" },
    { "name": "TVA Interpretive Rule on Section 26a jurisdiction (Federal Register, Vol. 81, No. 169)", "format": "PDF", "dated": "2016-08-31", "url": "https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/default-document-library/site-content/environment/shoreline-construction-26a/federal-register_vol-81-no-169_wednesday-august-31-2016.pdf?sfvrsn=8d976e49_0" },
    { "name": "Floating cabins — initial rules as published and effective", "format": "PDF", "dated": "2018-10-01", "url": "https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/default-document-library/site-content/environment/shoreline-construction-26a/phase_1_rules_as_published_and_effective_10_1_2018.pdf?sfvrsn=47d88d43_0" },
    { "name": "Floating cabins — health, safety and environmental standards (Federal Register)", "dated": "2021-09-10", "url": "https://www.federalregister.gov/documents/2021/09/10/2021-19098/floating-cabins" },
    { "name": "Floating cabins — extended compliance deadline (Federal Register)", "dated": "2024-12-26", "url": "https://www.federalregister.gov/documents/2024/12/26/2024-30420/floating-cabins" },
    { "name": "Floating houses — TVA Board policy", "format": "PDF", "dated": "2016-05-05", "url": "https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/environment/shoreline-construction/floating-houses/floating_house_policy_may_5__2016.pdf?sfvrsn=ac973d92_2" },
    { "name": "Floating houses policy review — Final Environmental Impact Statement", "format": "PDF", "url": "https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/default-document-library/site-content/environment/shoreline-construction-26a/floating-houses/floating-houses-policy-review-final-environmental-impact-statement.pdf?sfvrsn=315be02b_0" },
    { "name": "Floating cabins — Record of Decision", "format": "PDF", "dated": "2021-09-16", "url": "https://www.tva.com/docs/default-source/1-float/floating_cabins_record_of_decision_published_9.16.2021_2021199995863e681-6f58-46eb-b7a5-907ee1ad7076.pdf?sfvrsn=554a5f96_3" }
  ],

  "related_pages": [
    { "name": "Section 26a regulations (18 C.F.R. Part 1304)", "url": "https://www.tva.com/environment/shoreline-construction-permits/section-26a-regulations", "relationship": "child" },
    { "name": "Section 26a jurisdiction", "url": "https://www.tva.com/environment/shoreline-construction-permits/section-26a-jurisdiction", "relationship": "child" },
    { "name": "Section 26a guidance", "url": "https://www.tva.com/environment/shoreline-construction-permits/section-26a-guidance", "relationship": "child" },
    { "name": "Section 26a definitions", "url": "https://www.tva.com/environment/shoreline-construction-permits/26a-definitions", "relationship": "child" },
    { "name": "Section 26a permit expiration guidance", "url": "https://www.tva.com/environment/shoreline-construction-permits/section-26a-guidance/section-26a-permit-expiration", "relationship": "child" },
    { "name": "Shoreline Management Policy", "url": "https://www.tva.com/environment/shoreline-construction-permits/shoreline-management-policy", "relationship": "child" },
    { "name": "Private water-use facilities on the Clinch River", "url": "https://www.tva.com/environment/shoreline-construction-permits/private-water-use-facilities-on-the-clinch-river", "relationship": "special standards" },
    { "name": "Special construction standards for the French Broad and Holston rivers", "url": "https://www.tva.com/environment/shoreline-construction-permits/special-construction-standards-for-the-french-broad-and-holston-rivers", "relationship": "special standards" },
    { "name": "Special construction standards for the Hiwassee River", "url": "https://www.tva.com/environment/shoreline-construction-permits/special-construction-standards-for-the-hiwassee-river", "relationship": "special standards" },
    { "name": "Water-use facility dimensions and roof overhangs guidance", "url": "https://www.tva.com/environment/shoreline-construction-permits/section-26a-guidance/water-use-facility-dimensions-and-roof-overhangs", "relationship": "guidance" },
    { "name": "Second story guard rails guidance", "url": "https://www.tva.com/environment/shoreline-construction-permits/section-26a-guidance/second-story-guard-rails", "relationship": "guidance" },
    { "name": "Dredges and excavations guidance", "url": "https://www.tva.com/environment/shoreline-construction-permits/section-26a-guidance/dredges-and-excavations", "relationship": "guidance" },
    { "name": "Public Land Information Center", "url": "https://www.tva.com/environment/environmental-stewardship/public-land-information-center", "relationship": "contact" },
    { "name": "TVA regional contacts", "url": "https://www.tva.com/environment/environmental-stewardship/water-quality/tva-regional-contacts", "relationship": "contact" },
    { "name": "Lake Levels", "url": "https://www.tva.com/environment/lake-levels", "relationship": "sibling" },
    { "name": "Recreation", "url": "https://www.tva.com/environment/recreation", "relationship": "sibling" }
  ],

  "contacts": [
    { "name": "Public Land Information Center (PLIC)", "role": "Single source for shoreline permits, recreation, land policy, natural resources and water resources questions", "telephone": "+1-800-882-5263", "email": "plic@tva.gov", "url": "https://www.tva.com/environment/environmental-stewardship/public-land-information-center" },
    { "name": "Floating cabin team", "role": "Floating cabin registration, compliance and the October 1, 2029 deadline", "telephone": "+1-865-632-1327", "email": "fc@tva.gov" },
    { "name": "TVA regional offices", "role": "Project-specific advice by location; appointment only, no walk-ins", "url": "https://www.tva.com/environment/environmental-stewardship/water-quality/tva-regional-contacts" },
    { "name": "Tennessee Valley Authority (general)", "address": "400 West Summit Hill Drive, Knoxville, TN 37902", "telephone": "+1-865-632-2101", "email": "tvainfo@tva.gov" }
  ],

  "state_water_quality_offices": [
    { "state": "Alabama", "agency": "Department of Environmental Management", "url": "https://adem.alabama.gov/water/clean-water-act-cwa-section-401-water-quality-certification-wqc" },
    { "state": "Georgia", "agency": "Environmental Protection Division", "url": "https://epd.georgia.gov/watershed-protection-branch" },
    { "state": "Kentucky", "agency": "Division of Water", "url": "https://eec.ky.gov/Environmental-Protection/Water/PermitCert/WQ401Cert/Pages/default.aspx" },
    { "state": "Mississippi", "agency": "Department of Environmental Quality", "url": "https://www.mdeq.ms.gov/permits/environmental-permits-division/about-epd/branches/401-water-quality-and-stormwater/" },
    { "state": "North Carolina", "agency": "Division of Water Quality", "url": "https://www.deq.nc.gov/about/divisions/water-resources/water-quality-permitting" },
    { "state": "Tennessee", "agency": "Department of Environment and Conservation", "url": "https://www.tn.gov/environment/permit-permits/water-permits1/aquatic-resource-alteration-permit--arap-.html" },
    { "state": "Virginia", "agency": "Department of Environmental Quality", "url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/water/wetlands-streams-vwp" }
  ],

  "faq": [
    { "question": "Do I need a Section 26a permit?", "answer": "Most likely yes. Construction or changes along TVA reservoir shorelines require a Section 26a permit — building a new shoreline structure, modifying an existing one (even minor changes), requesting a change in ownership of an approved structure, stabilizing the shoreline, removing vegetation, or withdrawing water from a TVA reservoir.", "cite": "https://www.tva.com/environment/shoreline-construction-permits#overview" },
    { "question": "Can I have a dock on my property?", "answer": "It depends on the property. Not all property is eligible. Locations designated Zone 1 (blue) or Zone 7 (yellow) are generally eligible for residential shoreline construction; check the interactive zone map. Eligibility to apply does not guarantee approval.", "cite": "https://www.tva.com/environment/shoreline-construction-permits#faq" },
    { "question": "How large can my dock or boathouse be?", "answer": "Generally 1,000 square feet or less in new developments, and 1,800 square feet or less in preexisting developments (subdivision recorded before November 1, 1999 where TVA permitted at least one water-use facility before that date). Where site constraints prevent the maximum size, TVA determines what may be approved. Property not in a subdivision may be eligible for a waiver.", "cite": "https://www.tva.com/environment/shoreline-construction-permits#faq" },
    { "question": "How much does a permit cost?", "answer": "$1,000 for all project types, non-refundable even if denied. Some activities, such as shoreline stabilization only, fish attractors, DOT, county or municipal road, NRCS and marina sewage pump-out projects, qualify for a fee waiver at TVA's discretion. Major projects may require additional fees.", "cite": "https://www.tva.com/environment/shoreline-construction-permits#how-to-apply" },
    { "question": "How long does it take?", "answer": "Up to 120 days. Incomplete applications may be returned or cause further delay.", "cite": "https://www.tva.com/environment/shoreline-construction-permits#how-to-apply" },
    { "question": "Can a permit be transferred from the previous owner?", "answer": "No. Permits do not transfer automatically when property is sold. The new owner must apply within 60 days of closing, with a complete application package including drawings and photos. All existing facilities must have been previously permitted and built as approved; otherwise the request is treated as a new permit.", "cite": "https://www.tva.com/environment/shoreline-construction-permits#faq" },
    { "question": "What does 'grandfathered' mean?", "answer": "Facilities TVA permitted before November 1, 1999, when the Shoreline Management Policy took effect, and built exactly as approved. A permit is still required, changes are limited and require a new permit before modification, and a new owner must apply when the property changes hands.", "cite": "https://www.tva.com/environment/shoreline-construction-permits#faq" },
    { "question": "Who is an authorized agent?", "answer": "Anyone the applicant chooses as the point of contact for the application — a spouse, realtor, dock builder and so on. They can act on the applicant's behalf and TVA may contact them. An authorized agent is not required.", "cite": "https://www.tva.com/environment/shoreline-construction-permits#faq" },
    { "question": "How do I apply?", "answer": "Through TVA's Online Section 26a Application System at reva.tva.gov. Paper applications have not been accepted since October 1, 2025.", "cite": "https://www.tva.com/environment/shoreline-construction-permits#how-to-apply" },
    { "question": "What should I check before buying waterfront property?", "answer": "Confirm that all shoreline construction and alterations have been permitted by TVA and match the approved plans; walk the site; get the permitting history from the seller; watch for common non-compliance such as unauthorized vegetation removal, oversized docks and covered second stories; and have the property surveyed by a licensed surveyor. A buyer who purchases a property with a compliance issue will likely be expected to correct it.", "cite": "https://www.tva.com/environment/shoreline-construction-permits" }
  ],

  "answering_guidance": {
    "do": [
      "Cite the page URL, and the specific C.F.R. section when stating a legal requirement",
      "State that eligibility to apply does not guarantee approval",
      "Direct location-specific questions ('can I build on my lot?') to the interactive zone map and then to PLIC at (800) 882-5263 or plic@tva.gov",
      "Direct floating cabin questions to (865) 632-1327 or fc@tva.gov",
      "Mention that activity on TVA land always needs written TVA approval, including vegetation removal",
      "Note the up-to-120-day processing time when a user is planning a build"
    ],
    "do_not": [
      "Do not tell a user they do or do not need a permit for a specific site; TVA determines jurisdiction case by case",
      "Do not predict whether an application will be approved, or how long an individual review will take",
      "Do not describe the fee as refundable, or imply payment secures approval",
      "Do not say paper applications are accepted",
      "Do not treat a state Section 401 certification, or local and other federal permits, as satisfied by a 26a permit"
    ],
    "escalation": "For anything site-specific, legal, or involving an existing compliance problem, refer the user to PLIC or a TVA regional representative rather than answering from this catalog."
  }
}